The average train between Tysons Corner Center and Silver Spring takes 54 min and the fastest train takes 50 min. The train runs at least 5 times per hour from Tysons Corner Center to Silver Spring. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 15 minutes between Tysons Corner Center and Silver Spring. The earliest departure is at 5:11 AM in the morning, and the last departure from Tysons Corner Center is at 2:11 PM which arrives into Silver Spring at 3:02 PM. All services require a transfer at Tysons, Silver Line Center Platform and take an average of 54 min. The schedules shown below are for the next available departures.

50 min • 1 change

50 min • 1 change

53 min • 1 change

52 min • 1 change
Want to know about travelling from Tysons Corner Center to Silver Spring? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Tysons Corner Center to Silver Spring. However, there are services departing from Tysons Corner Center station and arriving at Silver Spring station via Farragut West, Blue/Orange/Silver Line Track 1 Platform. The journey, including transfers, takes approximately 54 min.
Tysons Corner Center to Silver Spring train services, operated by Washington Metropolitan Area Transit Authority, depart from Tysons, Silver Line Center Platform station.
Tysons Corner Center to Silver Spring train services, operated by Washington Metropolitan Area Transit Authority, arrive at Silver Spring, Red Line Center Platform station.
The distance between Tysons Corner Center and Silver Spring is 18.8 km. The road distance is 36 km.
You can take a vehicle from Tysons Corner Center to Silver Spring, Red Line Center Platform via Tysons, Silver Line Center Platform, Farragut West, Blue/Orange/Silver Line Track 1 Platform, and Farragut North, Red Line Center Platform in around 1h 3m.