The train between Sembawang and Tuas Checkpoint takes 1h 26m. The train runs, on average, once a week from Sembawang to Tuas Checkpoint. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run on demand between Sembawang and Tuas Checkpoint. Service times information will be available soon. All services run direct with no transfers required, and take on average 1h 26m. The schedules shown below are for the next available departures.
Want to know about travelling from Sembawang to Tuas Checkpoint? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Sembawang to Tuas Checkpoint. However, there are services departing from Sembawang station and arriving at Tuas Checkpoint station via Jurong East. The journey, including transfers, takes approximately 10,675,199d 2h.
Sembawang to Tuas Checkpoint train services, operated by SMRT, depart from Sembawang station.
Sembawang to Tuas Checkpoint train services, operated by SMRT, arrive at Tuas Link station.
The distance between Sembawang and Tuas Checkpoint is 23.4 km. The road distance is 36 km.
You can take a subway from Sembawang to Tuas Checkpoint via Jurong East and Tuas Link in around 1h 26m.