Rome2Rio

Gstaad to Lyon trains

Find Transport to Lyon

View schedule

Trip Overview

The average train between Gstaad and Lyon takes 6h 17m and the fastest train takes 5h 20m. The train runs, on average, 5 times per week from Gstaad to Lyon. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.

6h 17m
Duration
282 km
Distance
€103
Average price
5 times a week
Frequency

Gstaad to Lyon train times

Trains run 5 times a week between Gstaad and Lyon. The earliest departure is at 4:45 AM at night, and the last departure from Gstaad is at 11:36 AM which arrives into Lyon at 5:57 PM. All services require a transfer at Montreux and take an average of 6h 17m. The schedules shown below are for the next available departures.

Departing Saturday, October 31, 2026

  •  → 

    MOBSwiss Federal Railways (SBB CFF FFS)Swiss Federal Railways (SBB CFF FFS)Société Nationale des Chemins de fer Français (SNCF)6h 37m • 3 changes
  •  → 

    MOBSwiss Federal Railways (SBB CFF FFS)Swiss Federal Railways (SBB CFF FFS)Société Nationale des Chemins de fer Français (SNCF)5h 20m • 3 changes
  •  → 

    MOBSwiss Federal Railways (SBB CFF FFS)Swiss Federal Railways (SBB CFF FFS)Société Nationale des Chemins de fer Français (SNCF)6h 46m • 3 changes
  •  → 

    MOBSwiss Federal Railways (SBB CFF FFS)Swiss Federal Railways (SBB CFF FFS)Société Nationale des Chemins de fer Français (SNCF)6h 23m • 3 changes
  • Show more

Frequently asked questions

Want to know about travelling from Gstaad to Lyon? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.

Map of how to get from Gstaad to Lyon.ExpandLaunch map view
  • Distance: 282.3 km
  • Duration: 6h 17m

What companies run services between Gstaad, Switzerland and Lyon, France?

You can take a train from Gstaad to Lyon Part Dieu via Montreux, Genève, and Bellegarde in around 6h 15m.

Operators