The average train between Bath and Gloucester takes 1h 25m and the fastest train takes 1h 4m. The train service runs several times per day from Bath to Gloucester. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 3 hours between Bath and Gloucester. The earliest departure is at 8:50 AM in the morning, and the last departure from Bath is at 8:15 PM which arrives into Gloucester at 9:28 PM. All services run direct with no transfers required, and take on average 1h 25m. The schedules shown below are for the next available departures.
Want to know about travelling from Bath to Gloucester? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
Yes, there is a direct train departing from Bath station and arriving at Gloucester station. Services depart every 3 hours, and operate 6 times a week. The journey takes approximately 1h 25m.
Bath to Gloucester train services, operated by Great Western Railway (GWR), depart from Bath Spa station.
Bath to Gloucester train services, operated by Great Western Railway (GWR), arrive at Gloucester station.
Book your Bath to Gloucester train tickets online with Great Western Railway (GWR).
The distance between Bath and Gloucester is 55.2 km. The road distance is 81 km.
Great Western Railway (GWR) operates a train from Bath Spa to Gloucester every 3 hours. Tickets cost £22–45 and the journey takes 1h 22m.