The average train between Bandra Terminus and Nanded takes 12h 24m and the fastest train takes 11h 38m. The train service runs several times per day from Bandra Terminus to Nanded. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run 3 times a day between Bandra Terminus and Nanded. The earliest departure is at 5:05 AM in the morning, and the last departure from Bandra Terminus is at 9:12 PM which arrives into Nanded at 8:50 AM. All services require a transfer at Bandra and take an average of 12h 24m. The schedules shown below are for the next available departures.
Arrives next day

12h 41m • 1 change
Arrives next day

11h 38m • 1 change

12h 55m • 1 change
Arrives next day

12h 41m • 1 change
Arrives next day

11h 38m • 1 change

12h 55m • 1 change
Arrives next day

12h 39m • 1 change
Arrives next day

11h 38m • 1 change

12h 55m • 1 change
Arrives next day

12h 39m • 1 change
Arrives next day

11h 38m • 1 change

12h 55m • 1 change
Arrives next day

12h 39m • 1 change
Arrives next day

11h 38m • 1 change
Want to know about travelling from Bandra Terminus to Nanded? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Bandra Terminus to Nanded. However, there are services departing from Bandra Terminus station and arriving at Nanded station via Nanded. The journey, including transfers, takes approximately 12h 24m.
Bandra Terminus to Nanded train services, operated by Mumbai Suburban Railway, depart from Dadar station.
Bandra Terminus to Nanded train services, operated by Mumbai Suburban Railway, arrive at Nanded station.
The distance between Bandra Terminus and Nanded is 470.2 km. The road distance is 600 km.
Indian Railways operates a train from Dadar to Nanded 3 times a day. Tickets cost ₹320–2,500 and the journey takes 11h 5m.